GALMUS – hydrogeological borehole GCH – 10B
Drilling of hydrogeological borehole GCH – 10B to a depth of 60 metres at the Galmus site to provide drinking water for the village of Bystrany
Drilling of hydrogeological borehole GCH – 10B to a depth of 60 metres at the Galmus site to provide drinking water for the village of Bystrany
Complex reconstruction of the paper machine hall
URANPRES, s.r.o. carries out surveying works in its own direction in all phases of projects. From preparatory work to post-construction survey.
Implementation of the complete primary and secondary lining of the Ovčiarsko tunnel
Implementation of the primary and secondary lining of the Višňové tunnel
Construction and reconstruction of groundwater probes, including pumping tests and final evaluation
Complex reconstruction of the historical building of the Dardanelles Summer Palace and the building of the caretaker’s house in the village of Markušovce
Construction of tram lines in Košice
Carried out monitoring boreholes to detect environmental burdens at selected sites in the Košice and Prešov regions, including projects and final reports
Implementation of the construction of the Small Hydroelectric Power Plant